Beijing Guogongzhuang Water Plant Project (Phase 1: 500,000 m³/d) -- Water Distribution Plant
The water of Beijing Guogongzhuang Water Plant is from South-to-North Water Diversion, and the plant is planned and designed of 1,000,000 m³/d which belongs to national key projects. The constructions are in three phases, phase 1 plans to invest 3.5 billion RMB, the daily water supply capacity is 0.5 million m³, qualified to supply water before the end of 2014. Phase 1 includes water diversion project, water distribution plant and ancillary works, with a total land area of 230,000 m³. Water distribution plant use Newland NLO-11K and 2 sets of NLO-6K ozone generators. Based on the routine treatment of drinking water, Guogongzhuang Water Plant adopts advanced treatment technology of ozone, activated carbon, UV disinfection and membrane treatment, etc. The whole system embodies the multi-level barrier strategy, complementary to each industrial unit: it can effectively solve the turbidity, organic matter, microorganisms, algae, and other water quality problems (such as color, smell, taste, etc.). It is one of municipal drinking water industry projects with highest standards