Jiaxing United Wastewater Treatment Plant Upgrading Project
Jiaxing United Wastewater Treatment Plant is located in Haiyan County, Jiaxing City, Zhejiang Province, on the west of Hangzhou Bay Bridge. The current total treatment capacity is 600,000 m³/d, and the total footprint is about 43.3hm2.
Jiaxing United Wastewater Treatment Plant Phase 1 engineering is in the east of plant, built in 2003, designed treatment capacity is 300,000 m³/d, and the footprint of existing facilities is 20.2hm2. Phase 2 engineering is in the west of plant, built in 2012, designed treatment capacity is also 300,000 m³/d, and the footprint of existing facilities is 18hm2.
Jiaxing United Wastewater Treatment Plant is mainly served for Jiaxing combined sewage disposal area of about 1860km2.
The Plant mainly deal with domestic and industrial wastewater in Jiaxing combined sewage disposal area, of which industrial wastewater occupies a large proportion. Industrial wastewater mainly refers to chemical, printing and dyeing, etc.
This upgrading project is for the whole plant of 600,000 m³/d treatment capacity, and the peak coefficient is 1.3.